Water damage services

Structural drying: how walls and floors are dried and checked

Structural drying removes moisture that has soaked into walls, floors and framing using air movers and dehumidifiers, with moisture readings taken until each material reaches a dry standard. Drying time depends on the materials, the amount of water and the conditions, so a good provider shows you readings instead of promising a number of days.

Close-up of a metal fan grille in black and white

What is being dried

Water does not stay where it first lands. It wicks up walls, runs under baseboards and soaks into subfloors, insulation and cabinets. The surface can look dry while framing and drywall behind it are still wet. Structural drying targets that hidden moisture.

The equipment

Equipment Job
Air movers Move air across wet surfaces so water evaporates faster
Dehumidifiers Pull evaporated moisture out of the air so it does not just settle back
Moisture meters Read the moisture content of walls, floors and framing
Thermal cameras Help locate wet areas behind surfaces; they do not measure moisture content on their own
Wall and floor drying systems Dry cavities or hardwood floors without removing everything

What decides how long drying takes

  • The amount of water and how long it sat.
  • Materials. Dense materials such as hardwood and plaster hold water longer than thin drywall.
  • Humidity and temperature in the building. Florida’s humid air makes dehumidification an important part of the job.
  • Whether the water was clean, gray or black. Some contaminated materials are removed instead of dried.
  • Whether the HVAC system is running and the building can be kept closed.

Because of those variables, there is no standard number of days. See how long drying takes for the factors in more detail.

Monitoring: the part many people skip

A provider should return, take readings again and adjust equipment. Ask to see the readings for the first day and the final day. The U.S. EPA advises drying water-damaged areas and items within 24 to 48 hours; monitoring is how you know whether that is being achieved.

Questions to ask a provider

  • How will you measure that each material is dry, and can I see the readings?
  • How many visits do you expect, and what happens if readings are not falling?
  • Which parts of the structure will be opened, and why?
  • Are your technicians trained, for example through IICRC courses? (IICRC is a certification body. It does not issue Florida contractor licenses.)

Common questions

Why do I need so many fans and machines?

Air movers push dry air across wet surfaces and dehumidifiers remove the moisture from the air. The amount of equipment depends on the size of the wet area and the materials, so it is reasonable to ask the provider how they decided on the equipment count.

How do I know the structure is actually dry?

Ask for the moisture readings. Providers compare readings from affected materials with readings from unaffected materials of the same type. Drying is complete when affected materials reach the dry standard, not when the fans stop being loud.

Is it normal for the house to feel hot and humid during drying?

Equipment can warm a room and noise is common. It should not feel like moisture is increasing. Tell the provider if it does, or if you notice musty smells.

Sources

Links open the publisher's own page. General information only; it is not legal, insurance or engineering advice.